Datasets: Difference between revisions
Jump to navigation
Jump to search
(Created page with "==Comsics== ===target6/7 Study=== ===target5 Study=== ===cd3=== Produced to determine the cosmic background for CD3 review. Daya Bay generator. Talk summary [https://mu2e-d...") |
|||
Line 2: | Line 2: | ||
===target6/7 Study=== | ===target6/7 Study=== | ||
===target5 Study=== | ===target5 Study=== | ||
Generated to study cosmic rays that enter the TS hole and produce tracks, and how they can be degraded with new shielding blocks. This follows up on this category of events discovered in CD3 target1. Daya Bay generator. Talk summary [https://mu2e-docdb.fnal.gov:440/cgi-bin/ShowDocument?docid=8322 8322]. Expert: Ray Culbertson. | |||
V5_4_2 – reproduce target1, missing material | |||
– Git tag v5-7_9-cosmic-target5-v2 | |||
GG1 – maximum material | |||
– Git tag v5-7_9-cosmic-target5-v3 | |||
GG2 – maximum material | |||
– Git tag v5-7_9-cosmic-target5-v4 | |||
GG3 – maximum material | |||
– Git tag v5-7_9-cosmic-target5-v5 | |||
GG4 – maximum material | |||
– Git tag v5-7_9-cosmic-target5-v6 | |||
===cd3=== | ===cd3=== | ||
Revision as of 14:55, 12 September 2017
Comsics
target6/7 Study
target5 Study
Generated to study cosmic rays that enter the TS hole and produce tracks, and how they can be degraded with new shielding blocks. This follows up on this category of events discovered in CD3 target1. Daya Bay generator. Talk summary 8322. Expert: Ray Culbertson.
V5_4_2 – reproduce target1, missing material – Git tag v5-7_9-cosmic-target5-v2 GG1 – maximum material – Git tag v5-7_9-cosmic-target5-v3 GG2 – maximum material – Git tag v5-7_9-cosmic-target5-v4 GG3 – maximum material – Git tag v5-7_9-cosmic-target5-v5 GG4 – maximum material – Git tag v5-7_9-cosmic-target5-v6
cd3
Produced to determine the cosmic background for CD3 review. Daya Bay generator. Talk summary 7131. Expert: Ralf Ehrlich.
- general - all cosmics passing through a horizontal surface through detector.
- target1 - left side, around TS entrance
- target2 - upstream face
- target3 - downstream face
- target4 - cryo hole
Stages (s1-s4 uploaded)
- s1 - v542, simulate CRV, require 45 MeV of energy on detector volume surface, stop
- s2 - v566, simulate detectors, require 15 straw hits
- s3 - v574, reco, require a track 50-200 MeV
- s4 - v576, require tracks, 100-110 MeV, passing all cuts, PID, no upstream track
- s5 - v576, reconstruct CRV and make analysis ntuples, not uploaded
date | Offline | name |
5/2016 | v576 | sim.mu2e.cd3-cosmic-g4s4-general.v542_v566_v574_v576.art |
5/2016 | v576 | sim.mu2e.cd3-cosmic-g4s4-target1.v542_v566_v574_v576.art |
5/2016 | v576 | sim.mu2e.cd3-cosmic-g4s4-target2.v542_v566_v574_v576.art |
5/2016 | v576 | sim.mu2e.cd3-cosmic-g4s4-target3.v542_v566_v574_v576.art |
5/2016 | v576 | sim.mu2e.cd3-cosmic-g4s4-target4.v542_v566_v574_v576.art |