Datasets: Difference between revisions

From Mu2eWiki
Jump to navigation Jump to search
Line 37: Line 37:
===cd3===
===cd3===


Produced to determine the cosmic background for CD3 review.  Daya Bay generator.  Talk summary [https://mu2e-docdb.fnal.gov:440/cgi-bin/ShowDocument?docid=7131 7131], [https://mu2e-docdb.fnal.gov:440/cgi-bin/ShowDocument?docid=3059 memo]. Expert: Ralf Ehrlich.
Produced to determine the cosmic background for CD3 review.  Daya Bay generator.  Talk summary [https://mu2e-docdb.fnal.gov:440/cgi-bin/ShowDocument?docid=7131 7131], memo [https://mu2e-docdb.fnal.gov:440/cgi-bin/ShowDocument?docid=3059 3059]. Expert: Ralf Ehrlich.
* general - all cosmics passing through a horizontal surface through detector.
* general - all cosmics passing through a horizontal surface through detector.
* target1 - left side, around TS entrance
* target1 - left side, around TS entrance

Revision as of 15:20, 12 September 2017

Cosmics

target6/7 Study

Generated to study how cosmics enter the gap between the CRV top and sides, to help determine the CRV final design. Daya Bay generator. Summary talk 11147. Exprt: Ralf Ehrlich.

  • target6 - left top gap
  • target7 - right top gap

Stages: same as cd3 processing.

6/2017

target5 Study

Generated to study cosmic rays that enter the TS hole and produce tracks, and how they can be degraded with new shielding blocks. This follows up on this category of events discovered in CD3 target1. Daya Bay generator. Talk summary 8322. Expert: Ray Culbertson.

The talk shows the various shielding configurations. Stages:

  • s1 - v579, generate on a plane that is the TS opening, sim to a surface between TS3 and TS5
  • s2 - various branches off of v579, complete sim, reco, require a track 50-200 MeV.
date tag name
11/2016 v5-7_9 sim.mu2e.cd3-cosmic-g4s1-target5.0901a.art
11/2016 v5-7_9-cosmic-target5-v2 sim.mu2e.cd3-cosmic-g4s2-target5.1026a_geom1.art
11/2016 v5-7_9-cosmic-target5-v3 sim.mu2e.cd3-cosmic-g4s2-target5.1104a_geom2.art
11/2016 v5-7_9-cosmic-target5-v4 sim.mu2e.cd3-cosmic-g4s2-target5.1206a_geom3.art
11/2016 v5-7_9-cosmic-target5-v5 sim.mu2e.cd3-cosmic-g4s2-target5.1216a_geom4.art
11/2016 v5-7_9-cosmic-target5-v6 sim.mu2e.cd3-cosmic-g4s2-target5.1208a_geom5.art

cd3

Produced to determine the cosmic background for CD3 review. Daya Bay generator. Talk summary 7131, memo 3059. Expert: Ralf Ehrlich.

  • general - all cosmics passing through a horizontal surface through detector.
  • target1 - left side, around TS entrance
  • target2 - upstream face
  • target3 - downstream face
  • target4 - cryo hole

Stages (s1-s4 uploaded)

  • s1 - v542, simulate CRV, require 45 MeV of energy on detector volume surface, stop
  • s2 - v566, simulate detectors, require 15 straw hits
  • s3 - v574, reco, require a track 50-200 MeV
  • s4 - v576, require tracks, 100-110 MeV, passing all cuts, PID, no upstream track
  • s5 - v576, reconstruct CRV and make analysis ntuples, not uploaded
date Offline name
5/2016 v576 sim.mu2e.cd3-cosmic-g4s4-general.v542_v566_v574_v576.art
5/2016 v576 sim.mu2e.cd3-cosmic-g4s4-target1.v542_v566_v574_v576.art
5/2016 v576 sim.mu2e.cd3-cosmic-g4s4-target2.v542_v566_v574_v576.art
5/2016 v576 sim.mu2e.cd3-cosmic-g4s4-target3.v542_v566_v574_v576.art
5/2016 v576 sim.mu2e.cd3-cosmic-g4s4-target4.v542_v566_v574_v576.art