Difference between revisions of "MDC2018"

From Mu2eWiki
Jump to navigation Jump to search
(Created page with " A checklist of tasks in preparation for MDC2018. (just example entries for now) {|style="width: 95%" |- |style="width:8%"|'''Sign off''' |style="width:13%"|'''Responsible''...")
 
Line 1: Line 1:
 +
 +
A three-phase production for future studies, driven mostly by the change in positioning of the tracker stations to evenly-spaced and adding a hole through the center of the target.
 +
# re-run cd3 beams stage 2 through to background frames
 +
# create mislaligned and mis-calibrated samples
 +
# create mock electron trigger data with several sources of background tracks
  
  

Revision as of 22:28, 24 April 2018

A three-phase production for future studies, driven mostly by the change in positioning of the tracker stations to evenly-spaced and adding a hole through the center of the target.

  1. re-run cd3 beams stage 2 through to background frames
  2. create mislaligned and mis-calibrated samples
  3. create mock electron trigger data with several sources of background tracks


A checklist of tasks in preparation for MDC2018. (just example entries for now)

Sign off Responsible Topic Notes
Dave (LBL) plan jobs
Andrei develop beam fcl
Yuri prepare dsregion fcl
test job sizes and times