MDC2018: Difference between revisions

From Mu2eWiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 37: Line 37:
|-
|-
|  || Andrei || beam fcl ||  
|  || Andrei || beam fcl ||  
|-
|  || Andrei ||  beam profile  ||
|-
|-
|  || Yuri ||  CRV fcl  ||  
|  || Yuri ||  CRV fcl  ||  
|-
|-
|  || Dave (LBL) ||  BG Mix fcl  ||  
|  || Andrei ||  Calo compression  ||
|-
|  || Andrei ||  BG mix fcl  ||  
|-
|-
|  || Ray ||  Job Validation  ||  
|  || Ray ||  Job Validation  ||  

Revision as of 22:09, 25 April 2018

A four-phase production for future studies, driven mostly by the change in positioning of the tracker stations to evenly-spaced and adding a hole through the center of the target. The output will include the first official samples of detector data ('digis') and reconstruction output. The phases are:

  1. re-run cd3 beams stage 2 through to background frames and reference e- samples
  2. create samples for studying detector alignment, timing, and calibration
  3. create signal and fake samples
  4. create mock electron trigger samples with signals and several sources of background tracks


A checklist of tasks in preparation for MDC2018.

Sign off Responsible Topic Notes
Dave (Louisville) Tracker and OPA Geometry
Bertrand Calorimeter Geometry
Yuri Shielding Geometry
Ralf CRV Geometry
Andy Target and IPA Geometry
?? MBS + STM Geometry
Dave (Louisville) Alignment Infrastructure
Rob/Krzysztof StepPointMC StrawIndex->StrawId
Dave (LBL) Tracker Misalignment
Bertrand Calo Misalignment
Andrei beam fcl
Andrei beam profile
Yuri CRV fcl
Andrei Calo compression
Andrei BG mix fcl
Ray Job Validation
Pasha Radiative DIO weights