Mu2ePreliminaryOperationsReview: Difference between revisions

From Mu2eWiki
Jump to navigation Jump to search
No edit summary
Line 27: Line 27:


==References==
==References==
===Mu2e Detector and Computing Operations===
* Mu2e Preliminary Experiment Operations Plan
* ESH&Q Plan for Commissioning and Operations
* Requirements Document
[https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=30167 mu2e-doc 30167]
[https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=30167 mu2e-doc 30167]
===Mu2e Accelerator Operations===

Revision as of 19:26, 10 March 2020

Introduction

Agenda

  • Introduction session
    • Welcome
    • Mu2e science, apparatus, and organization
    • Mu2e and ES&H
  • Mu2e Detector and Computing Operations session
    • Detector and Computing Operations Overview
    • Facilities and Solenoids
    • Tracker
    • Calorimeter
    • Cosmic Ray Veto
    • Stopping Target Monitor / Extinction Monitor
    • TDAQ / Data Processing & Computing
  • Mu2e Accelerator Operations session
    • Overview of Accelerator Operations for Mu2e
    • 8 GeV Beam
    • Shielding and Loss Control
    • Target Station
    • Resonant Extraction

References

Mu2e Detector and Computing Operations

  • Mu2e Preliminary Experiment Operations Plan
  • ESH&Q Plan for Commissioning and Operations
  • Requirements Document

mu2e-doc 30167

Mu2e Accelerator Operations