Mu2ePreliminaryOperationsReview: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 26: | Line 26: | ||
** Resonant Extraction | ** Resonant Extraction | ||
== | ==Documentation== | ||
===Mu2e Detector and Computing Operations=== | ===Mu2e Detector and Computing Operations=== | ||
* Mu2e Preliminary Experiment Operations Plan | * Mu2e Preliminary Experiment Operations Plan | ||
* ESH&Q Plan for Commissioning and Operations | * ESH&Q Plan for Commissioning and Operations | ||
* Requirements | * Requirements documents | ||
** Experiment Facilities | |||
** Solenoids | |||
** Stopping Target Monitor (STM) | |||
** Tracker | |||
** Calorimeter | |||
** Cosmic Ray Veto system (CRV) | |||
** Trigger and Data Acquisition (TDAQ) | |||
** Extinction Monitor (ExtMon) | |||
** Data Processing and Computing (DPC) | |||
* WBS dictionary | |||
* ... | |||
[https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=30167 mu2e-doc 30167] | [https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=30167 mu2e-doc 30167] | ||
===Mu2e Accelerator Operations=== | ===Mu2e Accelerator Operations=== |
Revision as of 19:32, 10 March 2020
Introduction
- 05-06 May 2020: Preliminary Operations Planning Review at Fermilab
- Agenda and review committee at mu2e-docdb-32040
- Review charge questions at mu2e-docdb-28221
Agenda
- Introduction session
- Welcome
- Mu2e science, apparatus, and organization
- Mu2e and ES&H
- Mu2e Detector and Computing Operations session
- Detector and Computing Operations Overview
- Facilities and Solenoids
- Tracker
- Calorimeter
- Cosmic Ray Veto
- Stopping Target Monitor / Extinction Monitor
- TDAQ / Data Processing & Computing
- Mu2e Accelerator Operations session
- Overview of Accelerator Operations for Mu2e
- 8 GeV Beam
- Shielding and Loss Control
- Target Station
- Resonant Extraction
Documentation
Mu2e Detector and Computing Operations
- Mu2e Preliminary Experiment Operations Plan
- ESH&Q Plan for Commissioning and Operations
- Requirements documents
- Experiment Facilities
- Solenoids
- Stopping Target Monitor (STM)
- Tracker
- Calorimeter
- Cosmic Ray Veto system (CRV)
- Trigger and Data Acquisition (TDAQ)
- Extinction Monitor (ExtMon)
- Data Processing and Computing (DPC)
- WBS dictionary
- ...