Mu2ePreliminaryOperationsReview: Difference between revisions

From Mu2eWiki
Jump to navigation Jump to search
Line 42: Line 42:
* WBS dictionary
* WBS dictionary
* ESH&Q Plan for Commissioning and Operations
* ESH&Q Plan for Commissioning and Operations
* ...
[https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=30167 mu2e-doc 30167]


===Mu2e Accelerator Operations===
===Mu2e Accelerator Operations===

Revision as of 13:57, 12 March 2020

Introduction

Agenda

  • Introduction session
    • Welcome
    • Mu2e science, apparatus, and organization
    • Mu2e and ES&H
  • Mu2e Detector and Computing Operations session
    • Detector and Computing Operations Overview
    • Facilities and Solenoids
    • Tracker
    • Calorimeter
    • Cosmic Ray Veto
    • Stopping Target Monitor / Extinction Monitor
    • TDAQ / Data Processing & Computing
  • Mu2e Accelerator Operations session
    • Overview of Accelerator Operations for Mu2e
    • 8 GeV Beam
    • Shielding and Loss Control
    • Target Station
    • Resonant Extraction

Documentation

Mu2e Detector and Computing Operations

  • Mu2e Preliminary Experiment Operations Plan
  • Requirements documents
    • Experiment Facilities
    • Solenoids
    • Stopping Target Monitor (STM)
    • Tracker
    • Calorimeter
    • Cosmic Ray Veto system (CRV)
    • Trigger and Data Acquisition (TDAQ)
    • Extinction Monitor (ExtMon)
    • Data Processing and Computing (DPC)
  • WBS dictionary
  • ESH&Q Plan for Commissioning and Operations

Mu2e Accelerator Operations