Mu2ePreliminaryOperationsReview: Difference between revisions
Jump to navigation
Jump to search
Line 32: | Line 32: | ||
* Collaboration/FNAL org chart | * Collaboration/FNAL org chart | ||
* | * Operations risk register ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=26550 mu2e-docdb-26550]) | ||
* Plan to achieve detailed plan (including metrics) | * Plan to achieve detailed plan (including metrics) | ||
* Link milestones in Mu2e Operations P6 ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=27334 mu2e-docdb-27334]) | |||
===Mu2e Detector and Computing Operations=== | ===Mu2e Detector and Computing Operations=== | ||
* Mu2e Preliminary Experiment Operations Plan | * Mu2e Preliminary Experiment Operations Plan ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=31439 mu2e-docdb-31439]) | ||
* Requirements documents | * Requirements documents | ||
** Accelerator milestones | |||
** Experiment Facilities | ** Experiment Facilities | ||
** Solenoids | ** Solenoids | ||
Line 50: | Line 52: | ||
** Data Processing and Computing (DPC) | ** Data Processing and Computing (DPC) | ||
* WBS dictionary | * WBS dictionary | ||
* ESH&Q Plan for Commissioning and Operations | ** Boundaries between Operations WBS ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=28701 mu2e-docdb-28701]) | ||
* ESH&Q Plan for Commissioning and Operations ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=22972 mu2e-docdb-22972]) | |||
* Extracted PDF of schedule milestones | |||
* Extracted PDF of critical path for detector | |||
* Cost and resource tables per WBS and total roll-up | |||
===Mu2e Accelerator Operations=== | ===Mu2e Accelerator Operations=== | ||
* Extracted PDF of critical path for accelerator | |||
===Selected Project documentation=== | |||
* Mu2e Technical Design Report (TDR) ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=4299 mu2e-docdb-4299]) | |||
* Mu2e building transition to operations plan ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=5844 mu2e-docdb-5844]) | |||
** Transition to operations for Mu2e Conventional Facilities occurred Spring 2017 | |||
* Rules to estimate uncertainty for Labor and M&S ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=459 mu2e-docdb-459]) | |||
* [https://mu2e.fnal.gov/public/project/reviews/IPR2019/ DOE Independent Project Review website] 10-12 Dec 2019 at link |
Revision as of 15:05, 25 March 2020
Introduction
- 05-06 May 2020: Preliminary Operations Planning Review at Fermilab
- Review agenda: mu2e-docdb-32040
- Committee member contact information and writing assignments: mu2e-docdb-32040
- Review charge questions: mu2e-docdb-28221
- Video streaming and phone connection (zoom)
- Mu2e Operations Planning Team contact list
Links to talks
- Introduction session
- Welcome
- Mu2e science, apparatus, and organization
- Mu2e and ES&H
- Mu2e Detector and Computing Operations session
- Detector and Computing Operations Overview
- Facilities and Solenoids
- Tracker
- Calorimeter
- Cosmic Ray Veto
- Stopping Target Monitor / Extinction Monitor
- TDAQ / Data Processing & Computing
- Mu2e Accelerator Operations session
- Overview of Accelerator Operations for Mu2e
- 8 GeV Beam
- Shielding and Loss Control
- Target Station
- Resonant Extraction
Documentation
- Collaboration/FNAL org chart
- Operations risk register (mu2e-docdb-26550)
- Plan to achieve detailed plan (including metrics)
- Link milestones in Mu2e Operations P6 (mu2e-docdb-27334)
Mu2e Detector and Computing Operations
- Mu2e Preliminary Experiment Operations Plan (mu2e-docdb-31439)
- Requirements documents
- Accelerator milestones
- Experiment Facilities
- Solenoids
- Stopping Target Monitor (STM)
- Tracker
- Calorimeter
- Cosmic Ray Veto system (CRV)
- Trigger and Data Acquisition (TDAQ)
- Extinction Monitor (ExtMon)
- Data Processing and Computing (DPC)
- WBS dictionary
- Boundaries between Operations WBS (mu2e-docdb-28701)
- ESH&Q Plan for Commissioning and Operations (mu2e-docdb-22972)
- Extracted PDF of schedule milestones
- Extracted PDF of critical path for detector
- Cost and resource tables per WBS and total roll-up
Mu2e Accelerator Operations
- Extracted PDF of critical path for accelerator
Selected Project documentation
- Mu2e Technical Design Report (TDR) (mu2e-docdb-4299)
- Mu2e building transition to operations plan (mu2e-docdb-5844)
- Transition to operations for Mu2e Conventional Facilities occurred Spring 2017
- Rules to estimate uncertainty for Labor and M&S (mu2e-docdb-459)
- DOE Independent Project Review website 10-12 Dec 2019 at link