Mu2ePreliminaryOperationsReview: Difference between revisions

From Mu2eWiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 3: Line 3:
Login access to content at links will be emailed to reviewers.  Content at all links subject to change.
Login access to content at links will be emailed to reviewers.  Content at all links subject to change.


<big>IMPORTANT:  The planning for Mu2e Operations has followed the guidelines outlined in the DOE memo describing the Operations planning and review process ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=21579 mu2e-docdb-21579])</big>
<big>IMPORTANT:  The planning for Mu2e Operations follows the guidelines outlined in the DOE memo describing the Operations planning and review process ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=21579 mu2e-docdb-21579])</big>


* <b>05-06 May 2020</b>:  Preliminary Operations Planning Review at Fermilab   
* <b>05-06 May 2020</b>:  Preliminary Operations Planning Review at Fermilab   

Revision as of 16:33, 15 April 2020

Introduction

Login access to content at links will be emailed to reviewers. Content at all links subject to change.

IMPORTANT: The planning for Mu2e Operations follows the guidelines outlined in the DOE memo describing the Operations planning and review process (mu2e-docdb-21579)

  • 05-06 May 2020: Preliminary Operations Planning Review at Fermilab

Links to presentations

Documentation

Mu2e Detector and Computing Operations

Mu2e Accelerator Operations

  • Extracted PDF of critical path for accelerator
  • link to accelerator documents in mu2e-docdb (viewable by reviewer)

Select Project documentation