Mu2ePreliminaryOperationsReview: Difference between revisions

From Mu2eWiki
Jump to navigation Jump to search
Line 17: Line 17:
<big>All times Central time</big>
<big>All times Central time</big>


| time | Talk | speaker |
Tuesday 05 May 2020
 
{|  
! Time
! Talk  
! Speaker
|}
 


Tuesday 05 May 2020
* 09:00- Introduction session
* 09:00- Introduction session
** Welcome
** Welcome

Revision as of 15:10, 20 April 2020

IMPORTANT: The Mu2e Preliminary Operations Plan follows the guidelines outlined for the Preliminary Operations Plan in the memo from J. Siegrist to HEP that describes the Operations planning process (mu2e-docdb-21579)

Login access to content at links will be emailed to reviewers. Content at all links subject to change up until the review.

Introduction

  • 05-06 May 2020: Preliminary Operations Planning Review (zoom review)

Links to presentations

All times Central time

Tuesday 05 May 2020

Time Talk Speaker


  • 09:00- Introduction session
    • Welcome
    • Mu2e science, apparatus, and organization
    • Mu2e and ES&H
  • Mu2e Detector and Computing Operations session
  • Mu2e Accelerator Operations session
    • Overview of Accelerator Operations for Mu2e
    • 8 GeV Beam
    • Shielding and Loss Control
    • Target Station
    • Resonant Extraction
  • Response to questions

Documentation

Mu2e Detector and Computing Operations

Mu2e Accelerator Operations

  • Extracted PDF of critical path for accelerator
  • link to accelerator documents in mu2e-docdb (viewable by reviewer)

Select Project documentation