Mu2ePreliminaryOperationsReview: Difference between revisions
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
* Review charge questions: [http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=28221&version=1 mu2e-docdb-28221-v1] | * Review charge questions: [http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=28221&version=1 mu2e-docdb-28221-v1] | ||
* Committee logistics information: [http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=32040 mu2e-docdb-32040], including | * Committee logistics information: [http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=32040&version=7 mu2e-docdb-32040-v7], including | ||
** Review agenda and zoom information | ** Review agenda and zoom information | ||
** Committee member writing assignments and contact information | ** Committee member writing assignments and contact information |
Revision as of 14:24, 12 May 2020
IMPORTANT NOTE: The Mu2e Preliminary Operations Plan follows the guidelines outlined for the Preliminary Operations Plan in the memo from J. Siegrist to HEP that describes the Operations planning process (mu2e-docdb-21579-v1)
Login access to content at links will be emailed to reviewers. Content at all links subject to change up until the review.
Introduction
05-06 May 2020: Preliminary Operations Planning Review (zoom review)
- Review charge questions: mu2e-docdb-28221-v1
- Committee logistics information: mu2e-docdb-32040-v7, including
- Review agenda and zoom information
- Committee member writing assignments and contact information
- Speakers' contact information
- Zoom cheat sheet
- Slides shown at pre-review briefing 28 Apr 2020: mu2e-docdb-32983
Additional information, if requested by committee, will be at mu2e-docdb-32890
Links to presentations
All times Central time
Tuesday 05 May 2020
Time | Talk title | Speaker |
---|---|---|
9:30-10:00a | Full committee executive session (closed) | John Kogut |
10:00-10:10a | Welcome | Joe Lykken |
10:10-10:40a | Mu2e science, apparatus, and organization | Jim Miller |
10:40-10:55a | Mu2e and ES&H | George Ginther |
10:55-11:05p | BREAK |
Time | Talk title | Speaker |
---|---|---|
11:05-11:55a | Mu2e Detector and Computing Operations Overview | Greg Rakness |
11:55-12:15p | Facilities and Solenoids | Russ Rucinski |
12:15-12:45p | WORKING LUNCH | |
12:45-1:05p | Tracker | Monica Tecchio |
1:05-1:25p | Calorimeter | Simona Giovanella |
1:25-1:45p | Cosmic Ray Veto | Craig Group |
1:45-2:05p | Stopping Target Monitor / Extinction Monitor | Kevin Lynch |
2:05-2:25p | TDAQ / Data Processing & Computing | Rob Kutschke |
2:25-2:35p | BREAK |
Note: for brevity, presentations for some subsystems were merged in the agenda above. Subsystem-specific details can be found at:
- Stopping Target Monitor (STM) details (mu2e-docdb-32570)
- Target Extinction Monitor details (mu2e-docdb-32506)
- Trigger and Data Acquisition (TDAQ) details (mu2e-docdb-32567)
- Data Processing and Computing (DPC) details (mu2e-docdb-32612)
Time | Talk title | Speaker |
---|---|---|
2:35-3:05p | Overview of Accelerator Operations for Mu2e | Jerry Annala |
3:05-3:25p | Completion of Installation & Operations | Steve Werkema |
3:25-3:45p | 8 GeV Beam Transport | Diktys Stratakis |
3:45-4:05p | Shielding and Loss Control | Dean Still |
4:05-4:25p | Target Station | Dave Pushka |
4:25-4:45p | Resonant Extraction | Vladimir Nagaslaev |
4:45-5:45p | Full committee executive session (closed) | John Kogut |
Wednesday 06 May 2020
Time | Talk title | Speaker |
---|---|---|
9:30-10:30a | Response to reviewer questions | Greg Rakness |
10:30a-2:00p | Full committee executive session (closed) | John Kogut |
2:00-3:00p | Closeout Presentation | |
3:00p | ADJOURN |
Documentation
Mu2e Detector and Computing Operations
- Mu2e Preliminary Experiment Operations Plan (mu2e-docdb-31439-v5)
- Requirements documents
- Experiment Facilities (mu2e-docdb-22762)
- Solenoids (mu2e-docdb-22498)
- Stopping Target Monitor (STM) (mu2e-docdb-27463)
- Tracker (mu2e-docdb-22804)
- Calorimeter (mu2e-docdb-22786)
- Cosmic Ray Veto system (CRV) (mu2e-docdb-22699)
- Trigger and Data Acquisition (TDAQ) (mu2e-docdb-22774)
- Extinction Monitor (ExtMon) (mu2e-docdb-22831)
- Data Processing and Computing (DPC) (mu2e-docdb-22960)
- WBS dictionary (mu2e-docdb-25461)
- Boundaries between Operations WBS (mu2e-docdb-28701)
- Schedule details
- Description of the use of link milestones in Mu2e Operations P6 (mu2e-docdb-27334)
- Schedule milestones and critical path to be ready for beam (mu2e-docdb-32896)
- Cost and resource tables per WBS and total roll-up (mu2e-docdb-32497-v4)
- Operations risk register (mu2e-docdb-26550)
- Mu2e Commissioning and Operations ES&H plan (mu2e-docdb-22972)
- Mu2e data management plan (mu2e-docdb-5993)
Mu2e Accelerator Operations
- Accelerator operations requirements (mu2e-docdb-22816)
- Accelerator documentation (mu2e-docdb-32854)
- includes risks, WBS dictionary, Milestones summary, Mu2e Accelerator Operations assumptions, and BOE's
Select Mu2e Project documentation
- Mu2e Technical Design Report (TDR) (mu2e-docdb-4299)
- Mu2e Project Execution Plan (PEP) (mu2e-docdb-1172)
- Mu2e Project Hazard Analysis Report (HAR) (mu2e-docdb-675)
- Mu2e building transition to operations plan (mu2e-docdb-5844)
- Transition to operations for Mu2e Conventional Facilities occurred Spring 2017
- Rules to estimate uncertainty for Labor and M&S (mu2e-docdb-459)
- DOE Independent Project Review website 10-12 Dec 2019 at link