Mu2ePreliminaryOperationsReview: Difference between revisions

From Mu2eWiki
Jump to navigation Jump to search
No edit summary
Line 1: Line 1:
Final committee report can be found at [http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=34961&version=1 mu2e-docdb-34961-v1]


<big>IMPORTANT NOTE:  The Mu2e Preliminary Operations Plan follows the guidelines outlined for the <b>Preliminary Operations Plan</b> in the memo from J. Siegrist to HEP that describes the Operations planning process ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=21579&version=1 mu2e-docdb-21579-v1])</big>
<big>IMPORTANT NOTE:  The Mu2e Preliminary Operations Plan follows the guidelines outlined for the <b>Preliminary Operations Plan</b> in the memo from J. Siegrist to HEP that describes the Operations planning process ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=21579&version=1 mu2e-docdb-21579-v1])</big>

Revision as of 19:23, 25 August 2020

Final committee report can be found at mu2e-docdb-34961-v1

IMPORTANT NOTE: The Mu2e Preliminary Operations Plan follows the guidelines outlined for the Preliminary Operations Plan in the memo from J. Siegrist to HEP that describes the Operations planning process (mu2e-docdb-21579-v1)

Login access to content at links will be emailed to reviewers. Content at all links subject to change up until the review.

Introduction

05-06 May 2020: Preliminary Operations Planning Review (zoom review)

  • Review charge questions: mu2e-docdb-28221-v1
  • Committee logistics information: mu2e-docdb-32040-v7, including
    • Review agenda and zoom information
    • Committee member writing assignments and contact information
    • Speakers' contact information
    • Zoom cheat sheet
  • Slides shown at pre-review briefing 28 Apr 2020: mu2e-docdb-32983-v1

Additional information, if requested by committee, will be at mu2e-docdb-32890

Links to presentations

All times Central time

Tuesday 05 May 2020

Introduction (09:00-10:55)
Time Talk title Speaker
9:30-10:00a Full committee executive session (closed) John Kogut
10:00-10:10a Welcome Joe Lykken
10:10-10:40a Mu2e science, apparatus, and organization Jim Miller
10:40-10:55a Mu2e and ES&H George Ginther
10:55-11:05p BREAK
Session 1: Mu2e Detector and Computing Operations (11:05a-2:25p)
Time Talk title Speaker
11:05-11:55a Mu2e Detector and Computing Operations Overview Greg Rakness
11:55-12:15p Facilities and Solenoids Russ Rucinski
12:15-12:45p WORKING LUNCH
12:45-1:05p Tracker Monica Tecchio
1:05-1:25p Calorimeter Simona Giovanella
1:25-1:45p Cosmic Ray Veto Craig Group
1:45-2:05p Stopping Target Monitor / Extinction Monitor Kevin Lynch
2:05-2:25p TDAQ / Data Processing & Computing Rob Kutschke
2:25-2:35p BREAK

Note: for brevity, presentations for some subsystems were merged in the agenda above. Subsystem-specific details can be found at:

Session 2: Mu2e Accelerator Operations (2:35p-4:45p)
Time Talk title Speaker
2:35-3:05p Overview of Accelerator Operations for Mu2e Jerry Annala
3:05-3:25p Completion of Installation & Operations Steve Werkema
3:25-3:45p 8 GeV Beam Transport Diktys Stratakis
3:45-4:05p Shielding and Loss Control Dean Still
4:05-4:25p Target Station Dave Pushka
4:25-4:45p Resonant Extraction Vladimir Nagaslaev
4:45-5:45p Full committee executive session (closed) John Kogut

Wednesday 06 May 2020

Report writing and closeout (9:30a-3:00p)
Time Talk title Speaker
9:30-10:30a Response to reviewer questions Greg Rakness
10:30a-2:00p Full committee executive session (closed) John Kogut
2:00-3:00p Closeout Presentation
3:00p ADJOURN

Documentation

Mu2e Detector and Computing Operations

Mu2e Accelerator Operations

  • Accelerator operations requirements (mu2e-docdb-22816-v3)
  • Accelerator documentation (mu2e-docdb-32854-v2)
    • includes risks, WBS dictionary, Milestones summary, Mu2e Accelerator Operations assumptions, and BOE's

Select Mu2e Project documentation