Mu2ePreliminaryOperationsReview: Difference between revisions

From Mu2eWiki
Jump to navigation Jump to search
Line 32: Line 32:


* Collaboration/FNAL org chart
* Collaboration/FNAL org chart
* Rules to estimate uncertainty for Labor and M&S:  [http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=459 mu2e-docdb-459]
* Operations risk register ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=26550 mu2e-docdb-26550])
* Operations risk register
* Plan to achieve detailed plan (including metrics)
* Plan to achieve detailed plan (including metrics)
* Link milestones in Mu2e Operations P6 ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=27334 mu2e-docdb-27334])


===Mu2e Detector and Computing Operations===
===Mu2e Detector and Computing Operations===


* Mu2e Preliminary Experiment Operations Plan
* Mu2e Preliminary Experiment Operations Plan ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=31439 mu2e-docdb-31439])
* Requirements documents
* Requirements documents
** Accelerator milestones
** Experiment Facilities
** Experiment Facilities
** Solenoids
** Solenoids
Line 50: Line 52:
** Data Processing and Computing (DPC)
** Data Processing and Computing (DPC)
* WBS dictionary
* WBS dictionary
* ESH&Q Plan for Commissioning and Operations
** Boundaries between Operations WBS ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=28701 mu2e-docdb-28701])
* ESH&Q Plan for Commissioning and Operations ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=22972 mu2e-docdb-22972])
* Extracted PDF of schedule milestones
* Extracted PDF of critical path for detector
* Cost and resource tables per WBS and total roll-up
 


===Mu2e Accelerator Operations===
===Mu2e Accelerator Operations===
* Extracted PDF of critical path for accelerator
===Selected Project documentation===
* Mu2e Technical Design Report (TDR) ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=4299 mu2e-docdb-4299])
* Mu2e building transition to operations plan ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=5844 mu2e-docdb-5844])
** Transition to operations for Mu2e Conventional Facilities occurred Spring 2017
* Rules to estimate uncertainty for Labor and M&S ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=459 mu2e-docdb-459])
* [https://mu2e.fnal.gov/public/project/reviews/IPR2019/ DOE Independent Project Review website] 10-12 Dec 2019 at link

Revision as of 15:05, 25 March 2020

Introduction

  • 05-06 May 2020: Preliminary Operations Planning Review at Fermilab

Links to talks

  • Introduction session
    • Welcome
    • Mu2e science, apparatus, and organization
    • Mu2e and ES&H
  • Mu2e Detector and Computing Operations session
    • Detector and Computing Operations Overview
    • Facilities and Solenoids
    • Tracker
    • Calorimeter
    • Cosmic Ray Veto
    • Stopping Target Monitor / Extinction Monitor
    • TDAQ / Data Processing & Computing
  • Mu2e Accelerator Operations session
    • Overview of Accelerator Operations for Mu2e
    • 8 GeV Beam
    • Shielding and Loss Control
    • Target Station
    • Resonant Extraction

Documentation

  • Collaboration/FNAL org chart
  • Operations risk register (mu2e-docdb-26550)
  • Plan to achieve detailed plan (including metrics)

Mu2e Detector and Computing Operations

  • Mu2e Preliminary Experiment Operations Plan (mu2e-docdb-31439)
  • Requirements documents
    • Accelerator milestones
    • Experiment Facilities
    • Solenoids
    • Stopping Target Monitor (STM)
    • Tracker
    • Calorimeter
    • Cosmic Ray Veto system (CRV)
    • Trigger and Data Acquisition (TDAQ)
    • Extinction Monitor (ExtMon)
    • Data Processing and Computing (DPC)
  • WBS dictionary
  • ESH&Q Plan for Commissioning and Operations (mu2e-docdb-22972)
  • Extracted PDF of schedule milestones
  • Extracted PDF of critical path for detector
  • Cost and resource tables per WBS and total roll-up


Mu2e Accelerator Operations

  • Extracted PDF of critical path for accelerator


Selected Project documentation