Mu2ePreliminaryOperationsReview: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 1: | Line 1: | ||
==Introduction== | ==Introduction== | ||
Note: the links are NOT viewable by reviewers yet, but will be viewable by 21 April. | |||
* <b>05-06 May 2020</b>: Preliminary Operations Planning Review at Fermilab | * <b>05-06 May 2020</b>: Preliminary Operations Planning Review at Fermilab | ||
Line 7: | Line 9: | ||
** Video streaming and phone connection (zoom) | ** Video streaming and phone connection (zoom) | ||
** Mu2e Operations Planning Team contact list | ** Mu2e Operations Planning Team contact list | ||
==Links to talks== | ==Links to talks== | ||
Line 28: | Line 31: | ||
** Target Station | ** Target Station | ||
** Resonant Extraction | ** Resonant Extraction | ||
==Documentation== | ==Documentation== | ||
* Collaboration/FNAL org chart | * Collaboration/FNAL org chart | ||
* Operations risk register ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=26550 mu2e-docdb-26550]) | * Operations risk register ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=26550 mu2e-docdb-26550] - available 21 April) | ||
* Plan to achieve detailed plan (including metrics) | * Plan to achieve detailed plan (including metrics) | ||
* Mu2e data management plan ([http://mu2e-docdb.fnal.gov/cgi-bin/ShowDocument?docid=5993 mu2e-docdb-5993]) | |||
* Link milestones in Mu2e Operations P6 ([http://mu2e-docdb.fnal.gov | * Link milestones in Mu2e Operations P6 ([http://mu2e-docdb.fnal.gov/cgi-bin/ShowDocument?docid=27334 mu2e-docdb-27334] - available 21 April) | ||
===Mu2e Detector and Computing Operations=== | ===Mu2e Detector and Computing Operations=== | ||
* Mu2e Preliminary Experiment Operations Plan ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=31439 mu2e-docdb-31439]) | * Mu2e Preliminary Experiment Operations Plan ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=31439 mu2e-docdb-31439] - available 21 April) | ||
* Requirements documents | * Requirements documents | ||
** Accelerator milestones | ** Accelerator milestones ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=22816 mu2e-docdb-22816] - available 21 April) | ||
** Experiment Facilities | ** Experiment Facilities ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=22762 mu2e-docdb-22762] - available 21 April) | ||
** Solenoids | ** Solenoids ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=22498 mu2e-docdb-27463] - available 21 April) | ||
** Stopping Target Monitor (STM) | ** Stopping Target Monitor (STM) ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=27463 mu2e-docdb-27463] - available 21 April) | ||
** Tracker | ** Tracker ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=22804 mu2e-docdb-22804] - available 21 April) | ||
** Calorimeter | ** Calorimeter ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=22786 mu2e-docdb-22786] - available 21 April) | ||
** Cosmic Ray Veto system (CRV) | ** Cosmic Ray Veto system (CRV) ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=22699 mu2e-docdb-22699] - available 21 April) | ||
** Trigger and Data Acquisition (TDAQ) | ** Trigger and Data Acquisition (TDAQ) ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=22774 mu2e-docdb-22774] - available 21 April) | ||
** Extinction Monitor (ExtMon) | ** Extinction Monitor (ExtMon) ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=22831 mu2e-docdb-22831] - available 21 April) | ||
** Data Processing and Computing (DPC) | ** Data Processing and Computing (DPC) ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=22960 mu2e-docdb-22960] - available 21 April) | ||
* WBS dictionary | * WBS dictionary ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=25461 mu2e-docdb-25461] - available 21 April) | ||
** Boundaries between Operations WBS ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=28701 mu2e-docdb-28701]) | ** Boundaries between Operations WBS ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=28701 mu2e-docdb-28701] - available 21 April) | ||
* ESH&Q Plan for Commissioning and Operations ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=22972 mu2e-docdb-22972]) | * ESH&Q Plan for Commissioning and Operations ([https://mu2e-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=22972 mu2e-docdb-22972] - available 21 April) | ||
* Extracted PDF of schedule milestones | * Extracted PDF of schedule milestones | ||
* Extracted PDF of critical path for detector | * Extracted PDF of critical path for detector | ||
* Cost and resource tables per WBS and total roll-up | * Cost and resource tables per WBS and total roll-up | ||
===Mu2e Accelerator Operations=== | ===Mu2e Accelerator Operations=== | ||
* Extracted PDF of critical path for accelerator | * Extracted PDF of critical path for accelerator | ||
* link to accelerator documents in mu2e-docdb (viewable by reviewer) | |||
===Select Project documentation=== | |||
=== | |||
* Mu2e Technical Design Report (TDR) ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=4299 mu2e-docdb-4299]) | * Mu2e Technical Design Report (TDR) ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=4299 mu2e-docdb-4299]) |
Revision as of 16:10, 25 March 2020
Introduction
Note: the links are NOT viewable by reviewers yet, but will be viewable by 21 April.
- 05-06 May 2020: Preliminary Operations Planning Review at Fermilab
- Review agenda: mu2e-docdb-32040
- Committee member contact information and writing assignments: mu2e-docdb-32040
- Review charge questions: mu2e-docdb-28221
- Video streaming and phone connection (zoom)
- Mu2e Operations Planning Team contact list
Links to talks
- Introduction session
- Welcome
- Mu2e science, apparatus, and organization
- Mu2e and ES&H
- Mu2e Detector and Computing Operations session
- Detector and Computing Operations Overview
- Facilities and Solenoids
- Tracker
- Calorimeter
- Cosmic Ray Veto
- Stopping Target Monitor / Extinction Monitor
- TDAQ / Data Processing & Computing
- Mu2e Accelerator Operations session
- Overview of Accelerator Operations for Mu2e
- 8 GeV Beam
- Shielding and Loss Control
- Target Station
- Resonant Extraction
Documentation
- Collaboration/FNAL org chart
- Operations risk register (mu2e-docdb-26550 - available 21 April)
- Plan to achieve detailed plan (including metrics)
- Mu2e data management plan (mu2e-docdb-5993)
- Link milestones in Mu2e Operations P6 (mu2e-docdb-27334 - available 21 April)
Mu2e Detector and Computing Operations
- Mu2e Preliminary Experiment Operations Plan (mu2e-docdb-31439 - available 21 April)
- Requirements documents
- Accelerator milestones (mu2e-docdb-22816 - available 21 April)
- Experiment Facilities (mu2e-docdb-22762 - available 21 April)
- Solenoids (mu2e-docdb-27463 - available 21 April)
- Stopping Target Monitor (STM) (mu2e-docdb-27463 - available 21 April)
- Tracker (mu2e-docdb-22804 - available 21 April)
- Calorimeter (mu2e-docdb-22786 - available 21 April)
- Cosmic Ray Veto system (CRV) (mu2e-docdb-22699 - available 21 April)
- Trigger and Data Acquisition (TDAQ) (mu2e-docdb-22774 - available 21 April)
- Extinction Monitor (ExtMon) (mu2e-docdb-22831 - available 21 April)
- Data Processing and Computing (DPC) (mu2e-docdb-22960 - available 21 April)
- WBS dictionary (mu2e-docdb-25461 - available 21 April)
- Boundaries between Operations WBS (mu2e-docdb-28701 - available 21 April)
- ESH&Q Plan for Commissioning and Operations (mu2e-docdb-22972 - available 21 April)
- Extracted PDF of schedule milestones
- Extracted PDF of critical path for detector
- Cost and resource tables per WBS and total roll-up
Mu2e Accelerator Operations
- Extracted PDF of critical path for accelerator
- link to accelerator documents in mu2e-docdb (viewable by reviewer)
Select Project documentation
- Mu2e Technical Design Report (TDR) (mu2e-docdb-4299)
- Mu2e building transition to operations plan (mu2e-docdb-5844)
- Transition to operations for Mu2e Conventional Facilities occurred Spring 2017
- Rules to estimate uncertainty for Labor and M&S (mu2e-docdb-459)
- DOE Independent Project Review website 10-12 Dec 2019 at link