Mu2ePreliminaryOperationsReview: Difference between revisions

From Mu2eWiki
Jump to navigation Jump to search
No edit summary
Line 11: Line 11:
** Video streaming and phone connection (zoom)
** Video streaming and phone connection (zoom)
** Mu2e Operations Planning Team contact list
** Mu2e Operations Planning Team contact list
<big>The planning for Mu2e Operations has followed the guidelines outlined in the DOE Operations planning and review process ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=21579 mu2e-docdb-21579])</big>




Line 37: Line 39:


==Documentation==
==Documentation==
<big>The planning for Mu2e Operations has followed the guidelines outlined in the DOE Operations planning and review process ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=21579 mu2e-docdb-21579])</big>


* Operations risk register ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=26550 mu2e-docdb-26550])
* Operations risk register ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=26550 mu2e-docdb-26550])

Revision as of 14:36, 13 April 2020

Introduction

Content at all links subject to change until 21 April, when they will be frozen for the review.

Login access to content at links will be emailed to reviewers

  • 05-06 May 2020: Preliminary Operations Planning Review at Fermilab

The planning for Mu2e Operations has followed the guidelines outlined in the DOE Operations planning and review process (mu2e-docdb-21579)


Links to presentations

Documentation

Mu2e Detector and Computing Operations

Mu2e Accelerator Operations

  • Extracted PDF of critical path for accelerator
  • link to accelerator documents in mu2e-docdb (viewable by reviewer)

Select Project documentation