<big>IMPORTANT NOTE:  The Mu2e Preliminary Operations Plan follows the guidelines outlined for the <b>Preliminary Operations Plan</b> in the memo from J. Siegrist to HEP that describes the Operations planning process ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=21579 mu2e-docdb-21579])</big>
<big>IMPORTANT NOTE:  The Mu2e Preliminary Operations Plan follows the guidelines outlined for the <b>Preliminary Operations Plan</b> in the memo from J. Siegrist to HEP that describes the Operations planning process ([http://mu2e-docdb.fnal.gov:8080/cgi-bin/ShowDocument?docid=21579?version=1 mu2e-docdb-21579-v1])</big>


Login access to content at links will be emailed to reviewers.  Content at all links subject to change up until the review.
Login access to content at links will be emailed to reviewers.  Content at all links subject to change up until the review.

Revision as of 14:21, 12 May 2020

IMPORTANT NOTE: The Mu2e Preliminary Operations Plan follows the guidelines outlined for the Preliminary Operations Plan in the memo from J. Siegrist to HEP that describes the Operations planning process (mu2e-docdb-21579-v1)

Login access to content at links will be emailed to reviewers. Content at all links subject to change up until the review.

Introduction

05-06 May 2020: Preliminary Operations Planning Review (zoom review)

  • Review charge questions: mu2e-docdb-28221
  • Committee logistics information: mu2e-docdb-32040, including
    • Review agenda and zoom information
    • Committee member writing assignments and contact information
    • Speakers' contact information
    • Zoom cheat sheet
  • Slides shown at pre-review briefing 28 Apr 2020: mu2e-docdb-32983

Additional information, if requested by committee, will be at mu2e-docdb-32890

Links to presentations

All times Central time

Tuesday 05 May 2020

Introduction (09:00-10:55)
Time Talk title Speaker
9:30-10:00a Full committee executive session (closed) John Kogut
10:00-10:10a Welcome Joe Lykken
10:10-10:40a Mu2e science, apparatus, and organization Jim Miller
10:40-10:55a Mu2e and ES&H George Ginther
10:55-11:05p BREAK
Session 1: Mu2e Detector and Computing Operations (11:05a-2:25p)
Time Talk title Speaker
11:05-11:55a Mu2e Detector and Computing Operations Overview Greg Rakness
11:55-12:15p Facilities and Solenoids Russ Rucinski
12:15-12:45p WORKING LUNCH
12:45-1:05p Tracker Monica Tecchio
1:05-1:25p Calorimeter Simona Giovanella
1:25-1:45p Cosmic Ray Veto Craig Group
1:45-2:05p Stopping Target Monitor / Extinction Monitor Kevin Lynch
2:05-2:25p TDAQ / Data Processing & Computing Rob Kutschke
2:25-2:35p BREAK

Note: for brevity, presentations for some subsystems were merged in the agenda above. Subsystem-specific details can be found at:

Session 2: Mu2e Accelerator Operations (2:35p-4:45p)
Time Talk title Speaker
2:35-3:05p Overview of Accelerator Operations for Mu2e Jerry Annala
3:05-3:25p Completion of Installation & Operations Steve Werkema
3:25-3:45p 8 GeV Beam Transport Diktys Stratakis
3:45-4:05p Shielding and Loss Control Dean Still
4:05-4:25p Target Station Dave Pushka
4:25-4:45p Resonant Extraction Vladimir Nagaslaev
4:45-5:45p Full committee executive session (closed) John Kogut

Wednesday 06 May 2020

Report writing and closeout (9:30a-3:00p)
Time Talk title Speaker
9:30-10:30a Response to reviewer questions Greg Rakness
10:30a-2:00p Full committee executive session (closed) John Kogut
2:00-3:00p Closeout Presentation
3:00p ADJOURN

Documentation

Mu2e Detector and Computing Operations

Mu2e Accelerator Operations

  • Accelerator operations requirements (mu2e-docdb-22816)
  • Accelerator documentation (mu2e-docdb-32854)
    • includes risks, WBS dictionary, Milestones summary, Mu2e Accelerator Operations assumptions, and BOE's

Select Mu2e Project documentation