MDC2018: Difference between revisions

From Mu2eWiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 35: Line 35:
|-
|-
|  || Bertrand || Calo Misalignment  ||  
|  || Bertrand || Calo Misalignment  ||  
|-
|  || Richie || Tracker (Mis)calibration  ||
|-
|  || Ralf || CRV Light Tables ||
|-
|-
|  || Andrei || beam fcl ||  
|  || Andrei || beam fcl ||  

Revision as of 18:15, 25 April 2018

A four-phase production for future studies, driven mostly by the change in positioning of the tracker stations to evenly-spaced and adding a hole through the center of the target. The output will include the first official samples of detector data ('digis') and reconstruction output. The phases are:

  1. re-run cd3 beams stage 2 through to background frames and reference e- samples
  2. create samples for studying detector alignment, timing, and calibration
  3. create signal and fake samples
  4. create mock electron trigger samples with signals and several sources of background tracks


A checklist of tasks in preparation for MDC2018.

Sign off Responsible Topic Notes
Dave (Louisville) Tracker and OPA Geometry
Bertrand Calorimeter Geometry
Yuri Shielding Geometry
Ralf CRV Geometry
Andy Target and IPA Geometry
?? MBS + STM Geometry
Dave (Louisville) Alignment Infrastructure
Rob/Krzysztof StepPointMC StrawIndex->StrawId
Dave (LBL) Tracker Misalignment
Bertrand Calo Misalignment
Andrei beam fcl
Yuri CRV fcl
Dave (LBL) BG Mix fcl
Ray Job Validation
Pasha Radiative DIO weights