Mu2ePreliminaryOperationsReview

From Mu2eWiki
Jump to navigation Jump to search

Introduction

  • 05-06 May 2020: Preliminary Operations Planning Review at Fermilab

Links to talks

  • Introduction session
    • Welcome
    • Mu2e science, apparatus, and organization
    • Mu2e and ES&H
  • Mu2e Detector and Computing Operations session
    • Detector and Computing Operations Overview
    • Facilities and Solenoids
    • Tracker
    • Calorimeter
    • Cosmic Ray Veto
    • Stopping Target Monitor / Extinction Monitor
    • TDAQ / Data Processing & Computing
  • Mu2e Accelerator Operations session
    • Overview of Accelerator Operations for Mu2e
    • 8 GeV Beam
    • Shielding and Loss Control
    • Target Station
    • Resonant Extraction

Documentation

  • Collaboration/FNAL org chart
  • Operations risk register (mu2e-docdb-26550)
  • Plan to achieve detailed plan (including metrics)

Mu2e Detector and Computing Operations

  • Mu2e Preliminary Experiment Operations Plan (mu2e-docdb-31439)
  • Requirements documents
    • Accelerator milestones
    • Experiment Facilities
    • Solenoids
    • Stopping Target Monitor (STM)
    • Tracker
    • Calorimeter
    • Cosmic Ray Veto system (CRV)
    • Trigger and Data Acquisition (TDAQ)
    • Extinction Monitor (ExtMon)
    • Data Processing and Computing (DPC)
  • WBS dictionary
  • ESH&Q Plan for Commissioning and Operations (mu2e-docdb-22972)
  • Extracted PDF of schedule milestones
  • Extracted PDF of critical path for detector
  • Cost and resource tables per WBS and total roll-up


Mu2e Accelerator Operations

  • Extracted PDF of critical path for accelerator


Selected Project documentation