Mu2ePreliminaryOperationsReview

From Mu2eWiki
Revision as of 14:36, 13 April 2020 by Grakness (talk | contribs)
Jump to navigation Jump to search

Introduction

Content at all links subject to change until 21 April, when they will be frozen for the review.

Login access to content at links will be emailed to reviewers

  • 05-06 May 2020: Preliminary Operations Planning Review at Fermilab

The planning for Mu2e Operations has followed the guidelines outlined in the DOE Operations planning and review process (mu2e-docdb-21579)


Links to presentations

Documentation

Mu2e Detector and Computing Operations

Mu2e Accelerator Operations

  • Extracted PDF of critical path for accelerator
  • link to accelerator documents in mu2e-docdb (viewable by reviewer)

Select Project documentation