Mu2ePreliminaryOperationsReview

From Mu2eWiki
Revision as of 19:03, 15 April 2020 by Grakness (talk | contribs)
Jump to navigation Jump to search

IMPORTANT: The planning for Mu2e Operations follows the guidelines outlined for the Preliminary Operations Plan in the DOE memo describing the Operations planning and review process (mu2e-docdb-21579)

Login access to content at links will be emailed to reviewers. Content at all links subject to change up until the review.

Introduction

  • 05-06 May 2020: Preliminary Operations Planning Review (zoom review)

Links to presentations

Documentation

Mu2e Detector and Computing Operations

Mu2e Accelerator Operations

  • Extracted PDF of critical path for accelerator
  • link to accelerator documents in mu2e-docdb (viewable by reviewer)

Select Project documentation