Mu2ePreliminaryOperationsReview

From Mu2eWiki
Jump to navigation Jump to search

IMPORTANT: The Mu2e Preliminary Operations Plan follows the guidelines outlined for the Preliminary Operations Plan in the memo from J. Siegrist to HEP that describes the Operations planning process (mu2e-docdb-21579)

Login access to content at links will be emailed to reviewers. Content at all links subject to change up until the review.

Introduction

  • 05-06 May 2020: Preliminary Operations Planning Review (zoom review)

Links to presentations

All times Central time

| time | Talk | speaker |

Tuesday 05 May 2020

  • 09:00- Introduction session
    • Welcome
    • Mu2e science, apparatus, and organization
    • Mu2e and ES&H
  • Mu2e Detector and Computing Operations session
  • Mu2e Accelerator Operations session
    • Overview of Accelerator Operations for Mu2e
    • 8 GeV Beam
    • Shielding and Loss Control
    • Target Station
    • Resonant Extraction
  • Response to questions

Documentation

Mu2e Detector and Computing Operations

Mu2e Accelerator Operations

  • Extracted PDF of critical path for accelerator
  • link to accelerator documents in mu2e-docdb (viewable by reviewer)

Select Project documentation