IMPORTANT: The Mu2e Preliminary Operations Plan follows the guidelines outlined for the Preliminary Operations Plan in the memo from J. Siegrist to HEP that describes the Operations planning process (mu2e-docdb-21579)

Login access to content at links will be emailed to reviewers. Content at all links subject to change up until the review.

Introduction

  • 05-06 May 2020: Preliminary Operations Planning Review (zoom review)

Links to presentations

All times Central time


Tuesday 05 May 2020

Session 1: Introduction (09:00-10:55)
Time Talk title Speaker
10:00-10:10a Welcome Deputy Director for Research or CRO
10:10-10:40a Mu2e science, apparatus, and organization Jim Miller
10:40-10:55a Mu2e and ES&H George Ginther


Documentation

Mu2e Detector and Computing Operations

Mu2e Accelerator Operations

  • Extracted PDF of critical path for accelerator
  • link to accelerator documents in mu2e-docdb (viewable by reviewer)

Select Project documentation