Mu2ePreliminaryOperationsReview

From Mu2eWiki
Jump to navigation Jump to search

IMPORTANT: The Mu2e Preliminary Operations Plan follows the guidelines outlined for the Preliminary Operations Plan in the memo from J. Siegrist to HEP that describes the Operations planning process (mu2e-docdb-21579)

Login access to content at links will be emailed to reviewers. Content at all links subject to change up until the review.

Introduction

  • 05-06 May 2020: Preliminary Operations Planning Review (zoom review)

Links to presentations

All times Central time


Tuesday 05 May 2020

Session 1: Introduction (09:00-10:55)
Time docdb link Talk title Speaker
10:00-10:10a Welcome Deputy Director for Research or CRO
10:10-10:40a Mu2e science, apparatus, and organization Jim Miller
10:40-10:55a Mu2e and ES&H George Ginther


Session 2: Mu2e Detector and Computing Operations (11:05a-2:25p)
Time Talk title Speaker
11:05-11:55a Detector and Computing Operations Overview Greg Rakness
11:55-12:15p Facilities and Solenoids Russ Rucinski
12:15-12:45p WORKING LUNCH
12:45-01:05p Tracker Monica Tecchio
01:05-01:25p Calorimeter Simona Giovanella
01:25-01:45p Cosmic Ray Veto Craig Group
01:45-02:05p Stopping Target Monitor / Extinction Monitor Kevin Lynch
02:05-02:25p TDAQ / Data Processing & Computing Rob Kutschke
  • Mu2e Accelerator Operations session
    • Overview of Accelerator Operations for Mu2e
    • 8 GeV Beam
    • Shielding and Loss Control
    • Target Station
    • Resonant Extraction
  • Response to questions

Documentation

Mu2e Detector and Computing Operations

Mu2e Accelerator Operations

  • Extracted PDF of critical path for accelerator
  • link to accelerator documents in mu2e-docdb (viewable by reviewer)

Select Project documentation