ReleaseList
Jump to navigation
Jump to search
Tag | Date | Comment |
v6_2_1 | 05/08/2017 | For CRV tests; many changes (see Release notes). |
v6_2_0 | 04/14/2017 | geant update to v4_10_2_p03 |
v6_1_5 | 04/14/2017 | geometry updates (capture state before geant update) |
v6_1_1 | 03/17/2017 | Add building geometry, remove user stanza (CRV deadtime study) |
v6_0_7 | 02/28/2017 | buildopts, UPS and code for trigger; geometry for HRS and building, genreflex |
v6_0_6 | 02/03/2017 | B. Echenard rewrite of calorimeter code |
v6_0_4 | 01/18/2017 | DownstreameMinus -> DeM, widespread changes for tracking code structure |
v6_0_2 | 10/16/2016 | fix overlap in STM shield geometry |
v6_0_0 | 10/04/2016 | art version to v2_06_02a, root to version 6 |
v5_7_9 | 09/02/2016 | MBS geometry updates |
v5_7_8 | 08/09/2016 | satellite release, geometry cleanup |
v5_7_7 | 07/11/2016 | fix logical memory in CosmicDYB, fix OPA, geometry cleanups |
v5_7_6 | 05/09/2016 | Assorted bug fixes to the CalPatRec chain (cd3 cosmic s4,analysis) |
v5_7_5 | 05/07/2016 | code maintenance |
v5_7_4 | 04/29/2016 | updates to CRV, Trk, Cal. (cd3 cosmic s3, pass2) |
v5_7_3 | 04/18/2016 | building and electronics geometry for radiation |
v5_7_2 | 04/01/2016 | update PID, CutAndCount |
v5_7_1 | 03/27/2016 | changes to CRV reco code, neutron shielding |
v5_7_0 | 03/24/2016 | Update MVA weights, straw response to match measurements, CRV sheilding, art v1_17_07 fcl validation tools |
v5_6_7 | 02/27/2016 | code and geometry maintenance, (cd3 cosmic s3) |
v5_6_6 | 02/12/2016 | updated model of the tracker (cd3 beam s4, pass 2) |
v5_6_5 | 02/06/2016 | |
v5_6_3 | 01/29/2016 | |
v5_6_0 | 12/22/2015 | |
v5_5_6 | 11/24/2015 | |
v5_5_2 | 11/20/2015 | |
v5_5_4 | 11/17/2015 | |
v5_5_1 | 11/03/2015 | |
v5_5_0 | 10/25/2015 | |
v5_4_7 | 10/06/2015 | |
v5_4_6 | 09/20/2015 | (cd3 beam s4) |
v5_4_5 | 08/25/2015 | (cd3 beam s3) |
v5_4_4 | 08/16/2015 | |
v5_4_3 | 07/20/2015 | (cd3 beam s2) |
v5_4_2 | 07/15/2015 | (cd3 cosmic s1) |
v5_4_1 | 07/13/2015 | |
v5_3_6 | 07/02/2015 | |
v5_3_5 | 07/01/2015 | |
v5_3_4 | 06/19/2015 | |
v5_3_3 | 04/22/2015 | (cd3 beam s1) |
v5_3_2 | 04/10/2015 | |
v5_3_1 | 04/04/2015 | |
v5_3_0 | 03/23/2015 | |
v5_2_2 | 02/06/2015 |